A Case Study: The seismic stability of a conventional upstream-raised tailings impoundment – Part 2 (analyses)
James, M., Medina, M., Leahy, D., Gomes (2012)
65th Canadian Geotechnical Conference, Winnipeg, Manitoba.
James, M., Medina, M., Leahy, D., Gomes (2012)
65th Canadian Geotechnical Conference, Winnipeg, Manitoba.
Lefebvre, O., Neculita, C.M., Yue, X., Ng, H.Y. (2012)
Journal of Hazardous Materials 241-242: 411-417.
Li, L., Aubertin, M. (2012)
Canadian Geotechnical Journal 49(8): 994-1002.
Maqsoud, A., Bussière, B., Aubertin, M., Mbonimpa, M. (2012)
Geotechnical and Geological Engineering, 30: 1147-1159.
Maqsoud, A., Bussière, B., Aubertin, M., Plante, B., Cyr, J. (2012)
International Journal of Mining, Reclamation and Environment 26(4): 275-291.
Maqsoud, A., Bussière, B., Aubertin, M., Cyr, J. (2012)
GESRIM 2012: International Congress on the Management of the Mining Wastes and Closed Mines, 3 - 6 Avril 2012, Marrakech – Morocco.
Mbonimpa, M., Awoh, A.S., Aubertin, M. (2012)
65th Canadian Geotechnical Conference, September 30 - October 3, 2012 Winnipeg, Manitoba.
Medina, M., Leahy, D., Gomes, P., James, M. (2012)
65th Canadian Geotechnical Conference, Winnipeg, Manitoba.
Molson, J., Aubertin, A., Bussière, B. (2012)
Environmental Modelling & Software 38: 259-270.
Narvaez B. Aubertin, M. Saleh-Mbemba F. (2012)